Welcome to the official website of Suzhou Industrial Park Zhihong Project Management Co., Ltd!
中文English
Your location: Home > Industry news >
Contact Us

Suzhou Industrial Park Zhihong Engineering Management Consulting Co., Ltd
Tel: 0512-62586070
Fax: 0512-62586122
Email / e-mail: yunquzhihong@126.com
Address: Room 501, building 1, industrial finance building, No. 125, wangdun Road, Suzhou Industrial Park

Industry news

Suzhou Industrial Park construction project quality and safety supervision station documents

Author: ComeFrom: Date:2023/2/23 8:44:18 Hits:189
About doing a good job during the "two sessions" security precautions sheet
All relevant units:
        At present, the housing municipal engineering project under construction in the park has been fully resumed (opened), strictly implement the safety precautions, and strictly prevent all kinds of safety accidents, and now do a good job during the "two sessions" construction safety work notice is as follows
        First, we will strengthen the implementation of corporate responsibility. The participating units should consolidate the main responsibility of safety production, especially the state-owned projects should play a leading role in demonstration, and a special meeting should be held to publicize the requirements of safety production. During the "two sessions" period, dangerous operations (especially hot operations) should be suspended in principle, and non-necessary operations should not be carried out, and supervision departments should be supervised and upgraded. All projects under construction shall carry out a safety self-inspection and self-correction, all management personnel must be on the job, and the construction unit shall manage the arrival of key posts in the construction unit and supervision unit, and strictly prohibit the management vacuum caused by personnel not being on the job.
       Second, strengthen the investigation of fire hazards at construction sites. All projects under construction should strictly implement fire safety measures and carry out a fire safety education. According to relevant fire inspection documents, carry out a full coverage of fire safety hazards investigation, focusing on the establishment of fire safety management system, whether to prepare fire prevention technical plans on the construction site, fire suppression and emergency evacuation plans; Fire prevention and control situation in the "three areas" of the construction site (construction area, living area, office area), implementation of fire safety measures, fire equipment, fire facilities and fire access Settings.
        Third, strengthen the construction safety management of dangerous projects. Each project under construction should upgrade the control of all kinds of dangerous projects and large equipment, strictly manage the links such as the preparation, review, demonstration, disclosure and acceptance of special plans, and organize experts to carry out a survey of risks and hidden dangers of dangerous projects in strict accordance with the construction work of special plans, adhere to the inspection and reform, and resolutely prevent hidden dangers from becoming accidents.
        Fourth, strengthen the prevention of falling from high places. Each project under construction should strictly implement the "Notice on Further standardizing the management of construction site personnel in the city" and other requirements, strictly implement the "One belt, one hat", "three-level safety education" for new entrance personnel and the pre-shift safety "morning meeting" system, check and make up for the protection of the site edge hole, and effectively eliminate the risk of falling from the height of the site.
        Fifth, strengthen emergency duty. During the "two sessions", it is necessary to strictly implement the system of 24-hour special personnel on duty and leading cadres on duty, information reporting, etc., to ensure the smooth flow of information, and to ensure that in the event of an emergency, it can respond quickly, properly and efficiently.
        Sixth、Strengthen safety supervision and inspection. During the "two sessions", the park planning and Construction Committee and the quality and safety station will increase the frequency of inspections, maintain the high pressure situation of administrative law enforcement, resolutely and seriously investigate and punish the behavior of touching the safety "high voltage line", and comprehensively use effective measures such as notification, interview, exposure, enterprise credit evaluation, and transfer of administrative penalties to tighten the main responsibility of enterprises.


                                                       Suzhou Industrial Park construction engineering quality and safety supervision station
                                                      February 20, 2023

Next:Nothing
Copyright: Suzhou Industrial Park Zhihong Engineering Management Consulting Co., Ltd 苏ICP备20007680号-1 Technical support: shidewei Technology
Address: Room 501, building 1, industrial finance building, No. 125, wangdun Road, Suzhou Industrial Park TEL:0512-62586070 FAX:0512-62586122
E-MAIL:yuanquzhihong@126.com